Client:
Municipality of Bardolino

Location:
Calmasino (IT)

Period:
2014

Building surface:
900 mq

Works amount:
€ 192.000

NEW SCHOOL GYM IN CONNECTION WITH PRIMARY SCHOOL
The basement structure consists of a play area of about 380 sqm., the remaining portion of the basement about 260 sqm. includes changing room attached to the gym and to support rooms. On the ground floor, for a total area of about 260 square meters, there is a connection with the existing Primary school, a room that will be used as a multipurpose room and another as a bar.

Activity:

Detailed Desing