Client:
Corium S.r.l.

Location:
Treviso (IT)

Period:
2017

Building surface:

Work amount:

PRODUCTION SITE

Energy diagnosis of 3 factories aimed at the energy efficiency of the production processes and facilities serving the buildings.
Short-term measurements were carried out in order to determine the energy consumed by the most significant utilities. A survey was carried out in order to identify the nominal and partial load powers of the various consumption centres (nameplate data/technical data sheets). For the lighting system, in addition to surveying the number of lamps and ballasts, a point measurement was carried out in order to determine the actual consumption, which is constant throughout the year as it is not subject to regulation.

Activity:

Energy Audit