Client:
Galleria Verde S.r.l.
Iper Montebello S.p.a.

Location:
Milan (IT)

Period:
2018 – 2022

Building surface:
9.500 sqm

Works amount:
€ 2.600.000

ENLAGEMENT OF FIORDALISO SHOPPING CENTER

The expansion work included the construction of a new Hypermarket outside the facility in the southeastern area on the current gas station site. As part of the repositioning of the former Hypermarket unit located to the north, the area will be reconfigured with the creation of new units.
The reconfiguration of the existing parking lots included the addition of a multi- story parking lot to the north of the complex for a total seuperfacility of 28,000 square meters.
Finally, in the East of Fiordaliso area, the entrance was reconfigured with modification of the spaces of three stores (units 13-14-15), mechanized accesses from the basement in order to realize the union between the new Hypermarket building and the Shopping Center.

Activities:

Detailed Desing
Construction Management